ADU permit cost and fee breakdown in Atherton, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in Atherton, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

5 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$2,800 – $9,600

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$5,800

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$0 – $1,860

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$650 – $1,800

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$900 – $2,100

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • Separate trade permits$350 – $950

    Shown separately only where electrical, plumbing, or mechanical permits are billed outside a combination permit.

  • School district fees$500 – $1,400

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$250 – $950

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Processing, inspection & records$70 – $210

    Fixed processing, inspection, records, and administrative charges.

  • Surcharges, taxes & state fees$80 – $330

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Building permit issuance

The permit issuance charge; where plan check is bundled, the combined amount is carried here.

FeeAmountBasisSource
ADU building valuation basisVerify on the City’s official websiteFormula
Town of Atherton Master Fee Schedule, FY 2026-27Location: Attachment 5, Building Fees, rows 1–6; Master Fee Schedule page, Building Permit Fee Calculation ExampleConfirms: The current schedule separately gives zero valuation base for an ADU complying with Town setback standards and 50% for other ADUs; the Town page explains the service-requirement valuation methodology.
Building Permit and Plan Review by valuationSet by City formulaFormula
Town of Atherton Master Fee Schedule, FY 2026-27Location: Attachment 5, Effective July 6, 2026, Total Valuation / Building Permit Fee / Plan Review Fee tableConfirms: The current schedule sets a complete valuation-based permit formula and distinguishes 65% versus 45% plan-review percentage at the $500,000 threshold.

Technology & surcharges

Records, technology, and general plan surcharges.

FeeAmountBasisSource
Building technology surcharge3.5% formulaFormula
Town of Atherton Master Fee Schedule, FY 2026-27Location: Attachment 5, Building Fees, Technology surchargeConfirms: The FY 2026-27 schedule lists a 3.5% Building technology surcharge to fund permit systems and digital plan storage.

Surcharges, taxes & state fees

Percentage surcharges, construction taxes, and State-mandated charges.

FeeAmountBasisSource
ADU Planning feeVerify on the City’s official websiteEstimated range
Town of Atherton Master Fee Schedule, FY 2026-27Location: Planning Fees, rows 93–95, Junior accessory dwelling unit / Accessory Dwelling UnitConfirms: The FY 2026-27 Planning fee table gives $0 for a JADU and an ADU complying with Town setback standards, and $1,860 for the other ADU row.
General Plan Maintenance and Update surcharge2.65% formulaFormula
Town of Atherton Master Fee Schedule, FY 2026-27Location: Attachment 5, Building Fees, Surcharge for General Plan Maintenance and UpdateConfirms: The FY 2026-27 Building fee table lists a 2.65% General Plan Maintenance and Update surcharge.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Atherton before you commit money.