ADU permit cost and fee breakdown in Capitola, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in Capitola, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

4 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$6,700 – $15,850

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$9,780

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$350 – $1,832

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$380 – $800

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$1,900 – $4,000

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • School district fees$2,700 – $3,900

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$1,000 – $4,200

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Processing, inspection & records$120 – $548

    Fixed processing, inspection, records, and administrative charges.

  • Surcharges, taxes & state fees$250 – $570

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Building permit issuance

The permit issuance charge; where plan check is bundled, the combined amount is carried here.

FeeAmountBasisSource
ADU Building Permit valuation formulaFrom $160Formula
Fiscal Year 2026-2027 City Fee Schedule — Effective July 1, 2026Location: FY2026-27 City Fee Schedule, Building Fees — Table 1-A; Building Plan Check & Final Inspection; Information Technology FeeConfirms: The current City schedule gives every Table 1-A valuation bracket, the 1.5 combination-permit multiplier, and the named plan-check/final-inspection and technology layers.

Plan check

Review of your drawings for code compliance.

FeeAmountBasisSource
ADU Design Permit review$545 – $1,832Estimated range
Fiscal Year 2026-2027 City Fee Schedule — Effective July 1, 2026Location: FY2026-27 City Fee Schedule, Design Permits — Accessory Dwelling Unit Staff Review and PC ReviewConfirms: The current City schedule supplies both ADU review fees, while the City ADU page establishes that review level is project-specific.

Impact fees

Development impact fees. Prohibited for ADUs of 750 sq ft or less.

FeeAmountBasisSource
Affordable ADU development-fee waiver eligibilityVerify on the City’s official websiteVerify on the City’s official website
Resource Guide for Plan, Design, Permits, Review, Build — Accessory Dwelling UnitsLocation: City ADU Resource Guide page 24, fee-waiver FAQConfirms: The City-linked guide establishes the waiver conditions but does not supply a current project-specific waived amount.

Surcharges, taxes & state fees

Percentage surcharges, construction taxes, and State-mandated charges.

FeeAmountBasisSource
ADU Green Building Educational Resource Fund Fee0.25% of valuationPercent of valuation
Fiscal Year 2026-2027 City Fee Schedule — Effective July 1, 2026Location: FY2026-27 City Fee Schedule, Other Fees and Assessments — Green Building Educational Resource Fund FeeConfirms: The current City schedule states the multiplier directly and identifies the governing municipal-code section.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Capitola before you commit money.

Back to Capitola · Permit process · Build a permit report · How we build these estimates