ADU permit cost and fee breakdown in Concord, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in Concord, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

3 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$8,265 – $16,603

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$10,796

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$0 – $350

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$3,311 – $4,709

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$4,446 – $6,580

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • Separate trade permits$0 – $450

    Shown separately only where electrical, plumbing, or mechanical permits are billed outside a combination permit.

  • School district fees$275 – $3,000

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$0 – $1,200

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Surcharges, taxes & state fees$233 – $314

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Plan check

Review of your drawings for code compliance.

FeeAmountBasisSource
General building plan-review feeSet by City formulaFormula
T3a — Building Division Fees, Resolution 26.6042.1Location: PDF pages 28–29, F.1 General Building Valuation-Based Plan Review FeesConfirms: The current City schedule uses a stepped valuation formula for plan review rather than a flat ADU amount.

Inspection

Field inspections during construction.

FeeAmountBasisSource
General building inspection feeSet by City formulaFormula
T3a — Building Division Fees, Resolution 26.6042.1Location: PDF pages 29–30, F.2 General Building Valuation-Based Inspection FeesConfirms: The current City schedule uses a separate stepped valuation formula for required inspections.

Surcharges, taxes & state fees

Percentage surcharges, construction taxes, and State-mandated charges.

FeeAmountBasisSource
Building permit administrative feeSet by City formulaFormula
T3a — Building Division Fees, Resolution 26.6042.1Location: PDF page 26, A. Administrative FeeConfirms: The current schedule defines the administrative fee from construction valuation with a stated cap.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Concord before you commit money.

Back to Concord · Permit process · Build a permit report · How we build these estimates