ADU permit cost and fee breakdown in Davis, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in Davis, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

4 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$5,100 – $11,000

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$7,800

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$350 – $800

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$1,235 – $2,665

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$1,900 – $4,100

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • Separate trade permits$550 – $1,100

    Shown separately only where electrical, plumbing, or mechanical permits are billed outside a combination permit.

  • School district fees$350 – $600

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$200 – $800

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Processing, inspection & records$275 – $475

    Fixed processing, inspection, records, and administrative charges.

  • Surcharges, taxes & state fees$240 – $460

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Building permit issuance

The permit issuance charge; where plan check is bundled, the combined amount is carried here.

FeeAmountBasisSource
ADU Building Permit Basic Fee lookupVerify on the City’s official websiteVerify on the City’s official website
Fees and Charges FY 2026-2027Location: FY 2026-27 Building Division, Building Permit and Plan Check Fees attached valuation table; ADU page, Types of ADUsConfirms: The City’s current Building schedule provides a valuation table, but the public evidence does not identify a universally applicable ADU row or City-assigned valuation for a numerical result.

Plan check

Review of your drawings for code compliance.

FeeAmountBasisSource
Initial Building Plan Review65% formulaFormula
Fees and Charges FY 2026-2027Location: FY 2026-27 Building Division Fee Schedule, Fees for Building Plan Check — Initial Plan ReviewConfirms: The current City schedule expressly states the 65% initial-plan-review formula and its one-recheck inclusion.

Impact fees

Development impact fees. Prohibited for ADUs of 750 sq ft or less.

FeeAmountBasisSource
ADU impact-fee ruleFrom $0Formula
Accessory Dwellings Units (ADU) GuidelinesLocation: Accessory Dwellings Units (ADU) Guidelines, updated January 2026, page 1 — Impact FeesConfirms: The current City ADU handout explicitly sets the below-750-square-foot zero rule and the 750-plus proportional rule.

Utility connection

Water, sewer, and electrical connection or capacity charges.

FeeAmountBasisSource
ADU utility connection and capacity lookupVerify on the City’s official websiteVerify on the City’s official website
Accessory Dwellings Units (ADU) GuidelinesLocation: Accessory Dwellings Units (ADU) Guidelines, updated January 2026, page 2 — Services and Utility ConnectionsConfirms: The City identifies the existing-connection default and a conditional proportional separate-connection/capacity charge, but no dollar amount.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Davis before you commit money.

Back to Davis · Permit process · Build a permit report · How we build these estimates