ADU permit cost and fee breakdown in Modesto, California

An early-budgeting estimate of the permit-related fees an accessory dwelling unit is likely to incur in Modesto. These are not official figures.

Prepared by GetYourPermit editorial teamReport an error

9 fee lines

ADU size

California generally exempts ADUs under 750 sq ft from development impact fees, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

Estimated total permit fees at 750 sq ft

$8,050 – $35,350

Assumed construction valuation

$270,000

Used only to compute valuation-based fees. It is not a construction quote.

Where the money goes

  • Building permit$1,500 – $4,000

    The core permit issued by the city building department.

  • Plan check$1,000 – $2,500

    Review of your drawings for code compliance.

  • Impact fees$3,000 – $12,000

    Development impact fees. Often waived for ADUs under 750 sq ft.

  • School district fees$0 – $5,000

    Developer fees charged by the local school district.

  • Utility connection$2,000 – $10,000

    Water, sewer, and electrical connection or capacity charges.

  • Inspection$400 – $1,200

    Field inspections during construction.

  • Technology & surcharges$50 – $250

    Records, technology, and general plan surcharges.

  • Other$100 – $400

    Fees that do not fit the categories above.

The darker segment is the low end of the range; the full bar is the high end.

Read before you budget

  • Most fee lines are working estimates rather than verified published city rates. Confirm every line with the city before budgeting.
  • Totals do not vary by ADU size for this city, so the size selector will not change the estimate.

Fee items

Building permit

The core permit issued by the city building department.

Plan check

Review of your drawings for code compliance.

  • ADU Plan Check Fee

    $1,000 – $2,500

    Estimated range

Impact fees

Development impact fees. Often waived for ADUs under 750 sq ft.

School district fees

Developer fees charged by the local school district.

  • ADU School District Developer Fee

    $0 – $5,000

    Estimated range

Utility connection

Water, sewer, and electrical connection or capacity charges.

  • ADU Utility Connection and Capacity Fee

    $2,000 – $10,000

    Estimated range

Inspection

Field inspections during construction.

  • ADU Building Inspection Fee

    $400 – $1,200

    Estimated range

Technology & surcharges

Records, technology, and general plan surcharges.

  • ADU Technology Surcharge

    $50 – $250

    Estimated range

Other

Fees that do not fit the categories above.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Modesto before you commit money.

City reference pages for verification

Back to Modesto · How we build these estimates