ADU permit cost and fee breakdown in Modesto, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in Modesto, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

5 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$5,301 – $10,732

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$7,961

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$200 – $500

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$255 – $765

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$2,429 – $2,700

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • Separate trade permits$0 – $200

    Shown separately only where electrical, plumbing, or mechanical permits are billed outside a combination permit.

  • School district fees$2,100 – $3,150

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$100 – $2,750

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Processing, inspection & records$136 – $545

    Fixed processing, inspection, records, and administrative charges.

  • Surcharges, taxes & state fees$81 – $122

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Building permit issuance

The permit issuance charge; where plan check is bundled, the combined amount is carried here.

FeeAmountBasisSource
ADU or small-dwelling permit fee up to 1,200 sq. ft.$2,429Flat fee
Building Safety Division Fee Schedule — Fiscal Year 2025-26Location: PDF page 1, Residential Fees, Custom Residential Dwelling including Duplex

Plan check

Review of your drawings for code compliance.

FeeAmountBasisSource
Structural plan review when separately assessedSet by City formulaFormula
Building Safety Division Fee Schedule — Fiscal Year 2025-26Location: PDF page 5, Miscellaneous, Plan Review (Structural), and Division EndnotesConfirms: The expired FY 2025-26 schedule records a $255 hourly structural-review rate for separately assessed service; it is not verified as current.

Impact fees

Development impact fees. Prohibited for ADUs of 750 sq ft or less.

FeeAmountBasisSource
Capital Facilities Fee for an ADU under 750 square feet$0Flat fee
City of Modesto Capital Facilities Fees Policies and ProceduresLocation: PDF page 12, Accessory Dwelling Unit row and Table 3 exemption rowConfirms: The adopted City CFF policy marks ADUs under 750 square feet as no charge for this impact-fee layer.
Capital Facilities Fee for an ADU of 750 square feet or moreVerify on the City’s official websiteFormula
City of Modesto Capital Facilities Fees Policies and ProceduresLocation: PDF page 12, Accessory Dwelling Unit sectionConfirms: The City publishes the proportional CFF method but the reviewed source does not provide a current numeric CFF rate for use in the formula.

Surcharges, taxes & state fees

Percentage surcharges, construction taxes, and State-mandated charges.

FeeAmountBasisSource
General Plan Maintenance RecoverySet by City formulaFormula
Building Safety Division Fee Schedule — Fiscal Year 2025-26Location: PDF page 5, Miscellaneous, General Plan Maintenance RecoveryConfirms: The expired FY 2025-26 City schedule records a $0.55-per-$1,000 recovery charge; it is not verified as current.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Modesto before you commit money.

Back to Modesto · Permit process · Build a permit report · How we build these estimates