ADU permit cost and fee breakdown in Petaluma, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in Petaluma, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

5 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$13,410 – $19,688

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$16,493

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$182

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$3,906 – $5,232

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$3,906 – $5,232

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • Separate trade permits$750 – $1,400

    Shown separately only where electrical, plumbing, or mechanical permits are billed outside a combination permit.

  • School district fees$2,100 – $3,100

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$500 – $1,200

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Processing, inspection & records$200 – $375

    Fixed processing, inspection, records, and administrative charges.

  • Surcharges, taxes & state fees$1,866 – $2,967

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Building permit issuance

The permit issuance charge; where plan check is bundled, the combined amount is carried here.

FeeAmountBasisSource
Building Permit fee by project valuationFrom $94Formula
FY 2026-27 Master Fee Schedule with Fee Study UpdatesLocation: FY2026-27 Master Fee Schedule, Building, page 2Confirms: The current City schedule publishes the complete valuation-tier Building Permit formula; the City ADU FAQ confirms ADUs use the City permit process.

Plan check

Review of your drawings for code compliance.

FeeAmountBasisSource
Building Permit plan-check fee100% formulaFormula
FY 2026-27 Master Fee Schedule with Fee Study UpdatesLocation: FY2026-27 Master Fee Schedule, Building Plan Checks, page 2Confirms: The effective City Building table sets the Building Permit plan-check charge equal to the Building Permit fee.
Planning plan-check fee$182Flat fee
FY 2026-27 Master Fee Schedule with Fee Study UpdatesLocation: FY2026-27 Master Fee Schedule, Building Plan Checks, page 2Confirms: The current City schedule separately lists a $182 Planning Plan Check fee.

Impact fees

Development impact fees. Prohibited for ADUs of 750 sq ft or less.

FeeAmountBasisSource
ADU development-impact-fee exemption and proportional ruleVerify on the City’s official websiteFormula
Accessory Dwelling Units FAQ’sLocation: Accessory Dwelling Units FAQ, development impact fees answer; Development Impact Fees pageConfirms: The current City FAQ establishes the exemption and proportional rule, while the City directs project-specific impact/connection estimates to Planning rather than presenting a current FY2026-27 numeric matrix.

Surcharges, taxes & state fees

Percentage surcharges, construction taxes, and State-mandated charges.

FeeAmountBasisSource
Building supplemental City and State fee formulasFrom $1Formula
FY 2026-27 Master Fee Schedule with Fee Study UpdatesLocation: FY2026-27 Master Fee Schedule, Building supplemental rows, page 2Confirms: The current schedule identifies separately calculated incremental, residential seismic, State Building Standards Commission, and energy charges.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Petaluma before you commit money.

Back to Petaluma · Permit process · Build a permit report · How we build these estimates