ADU permit cost and fee breakdown in Portola Valley, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in Portola Valley, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

3 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$9,235 – $14,450

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$11,730

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$550 – $1,000

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$1,595 – $2,490

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$2,900 – $3,560

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • Separate trade permits$700 – $1,250

    Shown separately only where electrical, plumbing, or mechanical permits are billed outside a combination permit.

  • School district fees$2,100 – $3,200

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$950 – $2,150

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Processing, inspection & records$270 – $550

    Fixed processing, inspection, records, and administrative charges.

  • Surcharges, taxes & state fees$170 – $250

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Building permit issuance

The permit issuance charge; where plan check is bundled, the combined amount is carried here.

FeeAmountBasisSource
Residential Building Permit by valuationVerify on the City’s official websiteFormula
Town of Portola Valley FY 2026-27 Fee ScheduleLocation: FY 2026-27 Fee Schedule, p. 11, Building Fees & Permits, Permit FeesConfirms: The current Town schedule publishes the residential valuation brackets, but does not publish a dedicated ADU/JADU Building Permit row.
Current dedicated ADU/JADU Town feeVerify on the City’s official websiteVerify on the City’s official website
Quick Overview: ADU/JADU RequirementsLocation: FY 2026-27 Fee Schedule Building Fees & Permits; ADU/JADU requirements page

Plan check

Review of your drawings for code compliance.

FeeAmountBasisSource
Plan Review feeVerify on the City’s official websiteFormula
Town of Portola Valley FY 2026-27 Fee ScheduleLocation: FY 2026-27 Fee Schedule, p. 11, Building Fees & Permits, Plan Check FeesConfirms: The current schedule lists Town Plan Review at 55% of the permit fee but does not establish that it is the complete ADU/JADU fee path.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Portola Valley before you commit money.

Back to Portola Valley · Permit process · Build a permit report · How we build these estimates