ADU permit process in San Diego, California
Last verified August 28, 2026
Guide verified Prepared by GetYourPermit editorial teamReport an error
DSD reviews and issues all ADU/JADU building permits citywide; there are no exemptions from the Building Permit requirement. All new permit applications are submitted online through the Development Services Accela portal, with Planning, Building, and Fire review depending on project scope. State law requires action on a complete ADU application within 60 days; projects using preapproved plans get an expedited 30-day review.
Typical timeline
Preapproved-plan applications: 30-day review. Standard/custom applications: state law requires city action within 60 days of a complete application; overall plan check and issuance often takes several weeks longer depending on complexity.
Where to apply
- Contact
- 619-446-5000
Step by step
- 1
Confirm zoning and setback compliance
Use the city's ZAPP mapping tool to confirm the property's zone, front-setback requirements, and whether it is in the Coastal Overlay Zone.
- 2
Choose preapproved or custom plans
Select a preapproved ADU plan (City-accepted providers include San Diego County, Chula Vista, and Encinitas plan sets) for a faster 30-day review, or commission custom plans.
- 3
Prepare the plan set and forms
Assemble site plan, floor/roof plans, elevations, structural plans, Title 24 energy calculations, and required DSD forms (e.g., DS-3032, DS-16, DS-560).
- 4
Submit online for a Building Permit
Apply for a Building Permit (or Combination Building Permit) through the DSD's online Accela portal.
- 5
Plan review and corrections
Planning, Building, and (if applicable) Fire review the plans; respond to correction comments until approval.
- 6
Pay fees
Pay applicable General Plan Maintenance Fee, School Fees, Development Impact Fees, and plan check/permit issuance fees (see Information Bulletin 501).
- 7
Permit issuance
Permit is issued once plans are approved and fees are paid.
- 8
Construction, inspections, and final
Build per approved plans, schedule required inspections, and pass final inspection to complete the project.
What you need to submit
- Site plan/vicinity map
- Floor and roof plans
- Elevations and sections
- Structural plans and calculations
- Title 24 energy calculations
- Forms DS-3032, DS-16, DS-560
San Diego ADU rules at a glance
- JADU
- Max 500 sq ft, must be a conversion or attached within/to an existing or proposed single dwelling unit; requires a JADU Agreement
- Height
- Detached ADUs in single-dwelling zones limited to 2 stories; must otherwise comply with base zone height limits
- Parking
- No parking required outside the Coastal Overlay/Beach Impact Area for ADUs; none required for JADUs
- Max size
- ADU: 150-1,200 sq ft; JADU: 150-500 sq ft (conversions exempt from the ADU max)
- Setbacks
- Front setback of the zone applies; ADU may encroach into side, street-side, and rear setbacks (up to the property line in some cases); if the side/rear property line abuts residential property and the ADU exceeds 16 ft in height, a 4-ft side/rear setback applies
- Owner occupancy
- Not required for ADUs; required for JADUs only if the JADU shares sanitation facilities with the main residence
Pre-approved ADU plans
San Diego publishes pre-approved plan sets, which can shorten plan check.
View pre-approved plansPractical tips
- Preapproved plans (County of San Diego, Chula Vista, or Encinitas providers) cut review to 30 days but require paying the plan provider a separate licensing fee.
- Check ZAPP for your zone before design -- front setback compliance is mandatory even though side/rear setbacks can often go to the property line.
- Properties in the Coastal Overlay Zone or Beach Impact Area have different parking and process rules -- check the Coastal ADU page.
- The ADU Bonus Program can allow extra non-deed-restricted units if you include a deed-restricted affordable ADU.
Sources for this guide
Additional city reference pages
Secondary source summarizing city utility and school-fee estimates; use only as directional context until official schedules are checked.
Accessed May 31, 2026
Secondary source summarizing county fee components and SB 13-related fee waiver claims; should be verified against official schedules.
Accessed May 31, 2026
Regional ADU data context for San Diego County; useful for broader context, though not a fee schedule.
Accessed May 31, 2026
Official county ADU page; confirms the county fee waiver program ended and provides county-specific ADU context.
Accessed May 31, 2026