ADU permit cost and fee breakdown in San Rafael, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in San Rafael, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

5 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$6,730 – $12,150

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$9,320

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$420 – $640

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$1,365 – $2,080

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$2,100 – $3,200

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • Separate trade permits$450 – $950

    Shown separately only where electrical, plumbing, or mechanical permits are billed outside a combination permit.

  • School district fees$2,000 – $3,600

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$100 – $850

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Processing, inspection & records$210 – $635

    Fixed processing, inspection, records, and administrative charges.

  • Surcharges, taxes & state fees$85 – $195

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Building permit issuance

The permit issuance charge; where plan check is bundled, the combined amount is carried here.

FeeAmountBasisSource
Valuation-based building permitVerify on the City’s official websiteVerify on the City’s official website
Building & Safety ServicesLocation: Building & Safety Services, page 1, Valuation-Based Building Permit FeesConfirms: The City publishes the valuation table but the ADU application needs its project total-cost valuation before a numeric permit amount can be selected.

Plan check

Review of your drawings for code compliance.

FeeAmountBasisSource
Structural plan check65% formulaFormula
Building & Safety ServicesLocation: Building & Safety Services, page 1, Valuation-Based Plan Check FeesConfirms: The City lists Building/Structural plan check as 65% of the building permit fee.
Planning building-permit plan check20% formulaFormula
Planning Service FeesLocation: Planning Service Fees, Building Permit - Plan ChecksConfirms: The City planning schedule lists Building Permit - Plan Checks at 20% of permit fee.

Impact fees

Development impact fees. Prohibited for ADUs of 750 sq ft or less.

FeeAmountBasisSource
ADU park and recreation impact fee$1.25 / sq ftPer square foot
2026 Development Impact Fees and Affordable Housing In-Lieu FeesLocation: 2026 Development Impact Fees, Parkland and Recreation Facility Development Impact Fees for ADUsConfirms: The updated City handout lists $1.25 per square foot for the current 50% ADU rate and states the under-750-square-foot exemption.
ADU transportation mitigation fee$2.03 / sq ftPer square foot
2026 Development Impact Fees and Affordable Housing In-Lieu FeesLocation: 2026 Development Impact Fees, Transportation Mitigation Fee — Effective August 14, 2026Confirms: The City table lists $2.03 per square foot for ADUs and expressly limits it to ADUs greater than 750 square feet.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with San Rafael before you commit money.

Back to San Rafael · Permit process · Build a permit report · How we build these estimates