ADU permit cost and fee breakdown in San Ramon, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in San Ramon, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

2 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$4,650 – $12,850

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$8,150

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$450 – $1,050

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$1,300 – $3,200

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$1,400 – $3,400

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • Separate trade permits$500 – $1,350

    Shown separately only where electrical, plumbing, or mechanical permits are billed outside a combination permit.

  • School district fees$400 – $1,700

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$0 – $1,000

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Processing, inspection & records$550 – $1,000

    Fixed processing, inspection, records, and administrative charges.

  • Surcharges, taxes & state fees$50 – $150

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Building permit issuance

The permit issuance charge; where plan check is bundled, the combined amount is carried here.

FeeAmountBasisSource
Building Permit and plan-check fee lookupVerify on the City’s official websiteVerify on the City’s official website
Building Forms and HandoutsLocation: Building Forms and Handouts, Applications, Special Forms and InformationConfirms: The current City Building page identifies the Fee Resolution as the fee authority but does not state numerical Building rates in accessible HTML.

Plan check

Review of your drawings for code compliance.

FeeAmountBasisSource
Permit Ready ADU still subject to site-specific plan checkVerify on the City’s official websiteVerify on the City’s official website
Accessory Dwelling Units (ADUs)Location: Accessory Dwelling Units, Permit Ready ADU ProgramConfirms: The current City ADU page says site-specific requirements are verified during Building Permit plan-check review.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with San Ramon before you commit money.

Back to San Ramon · Permit process · Build a permit report · How we build these estimates