ADU permit cost and fee breakdown in Santa Rosa, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in Santa Rosa, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

7 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$3,050 – $5,986

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$4,234

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$250 – $550

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$1,080 – $1,350

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$564 – $750

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • Separate trade permits$250 – $600

    Shown separately only where electrical, plumbing, or mechanical permits are billed outside a combination permit.

  • School district fees$400 – $1,500

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$200 – $550

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Processing, inspection & records$50 – $250

    Fixed processing, inspection, records, and administrative charges.

  • Surcharges, taxes & state fees$256 – $436

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Plan check

Review of your drawings for code compliance.

FeeAmountBasisSource
R-3 single-family new plan-review fee$1.80 / sq ftPer square foot
City of Santa Rosa Fee Schedule — Version V2Location: Pages 36 and 41, Sections 6.02 and 6.08, Fee 33 R-3 Single-Family New, Plan Check columnConfirms: The R-3 Single-Family New row lists $1.80 per square foot for plan check and the table footnote sets a $130.79 minimum.
R-3 single-family addition/alteration plan-review fee$2.13 / sq ftPer square foot
City of Santa Rosa Fee Schedule — Version V2Location: Page 41, Section 6.08, Fee 35 R-3 Single-Family Residential — Addition/Alteration, Plan Check columnConfirms: The R-3 addition/alteration row lists a $2.13 per-square-foot plan-check rate and the table's plan-review minimum applies.

Inspection

Field inspections during construction.

FeeAmountBasisSource
R-3 single-family new inspection/permit fee$0.94 / sq ftPer square foot
City of Santa Rosa Fee Schedule — Version V2Location: Pages 37 and 41, Sections 6.03 and 6.08, Fee 33 R-3 Single-Family New, Inspection columnConfirms: The R-3 Single-Family New row lists $0.94 per square foot for inspection and the table footnote sets a $105.88 minimum.
R-3 single-family addition/alteration inspection/permit fee$0.94 / sq ftPer square foot
City of Santa Rosa Fee Schedule — Version V2Location: Page 41, Section 6.08, Fee 35 R-3 Single-Family Residential — Addition/Alteration, Inspection columnConfirms: The R-3 addition/alteration row lists a $0.94 per-square-foot inspection rate and the table's inspection minimum applies.
Reinspection feeFrom $100Formula
City of Santa Rosa Fee Schedule — Version V2Location: Page 37, Section 6.03, ReinspectionConfirms: The schedule publishes the reinspection rate by half-hour and states when it must be paid.

Technology & surcharges

Records, technology, and general plan surcharges.

FeeAmountBasisSource
Technology Surcharge5.69% formulaFormula
City of Santa Rosa Fee Schedule — Version V2Location: Pages 1 and 39, Sections 1.03a and 6.05Confirms: The current schedule publishes a 5.69% technology surcharge capped at $2,500 per permit.

Surcharges, taxes & state fees

Percentage surcharges, construction taxes, and State-mandated charges.

FeeAmountBasisSource
Advance Planning Surcharge12.26% formulaFormula
City of Santa Rosa Fee Schedule — Version V2Location: Pages 1 and 39, Sections 1.03b and 6.05Confirms: The current schedule publishes a 12.26% advance-planning surcharge capped at $5,000 per permit.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Santa Rosa before you commit money.

Back to Santa Rosa · Permit process · Build a permit report · How we build these estimates