ADU permit cost and fee breakdown in Tiburon, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in Tiburon, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

2 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$8,095 – $19,195

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$12,995

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$595

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$1,600 – $3,800

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$2,000 – $4,800

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • Separate trade permits$750 – $1,850

    Shown separately only where electrical, plumbing, or mechanical permits are billed outside a combination permit.

  • School district fees$1,200 – $2,500

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$1,100 – $3,600

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Processing, inspection & records$450 – $1,150

    Fixed processing, inspection, records, and administrative charges.

  • Surcharges, taxes & state fees$400 – $900

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Building permit issuance

The permit issuance charge; where plan check is bundled, the combined amount is carried here.

FeeAmountBasisSource
Building Permit fee lookupVerify on the City’s official websiteVerify on the City’s official website
Apply for a Building PermitLocation: Apply for a Building Permit, Permit Fees & Re-Evaluation FeesConfirms: The current Town page establishes valuation-based calculation and application-time staff estimate, but not a capturable numerical formula.

Surcharges, taxes & state fees

Percentage surcharges, construction taxes, and State-mandated charges.

FeeAmountBasisSource
Secondary Dwelling Unit Permit$595Flat fee
Forms & FeesLocation: Forms & Fees, Other Planning Fees, Secondary Dwelling Unit PermitConfirms: The live Town fee page presents this named permit as a $595 flat fee; it does not establish a complete ADU total.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Tiburon before you commit money.

City reference pages for verification

Back to Tiburon · Permit process · Build a permit report · How we build these estimates