ADU permit cost and fee breakdown in Vacaville, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in Vacaville, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

3 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$4,209 – $9,662

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$6,867

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$400 – $850

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$971 – $1,311

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$1,295 – $1,748

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • Separate trade permits$500 – $1,100

    Shown separately only where electrical, plumbing, or mechanical permits are billed outside a combination permit.

  • School district fees$480 – $1,620

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$0 – $1,200

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Processing, inspection & records$313 – $933

    Fixed processing, inspection, records, and administrative charges.

  • Surcharges, taxes & state fees$250 – $900

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Building permit issuance

The permit issuance charge; where plan check is bundled, the combined amount is carried here.

FeeAmountBasisSource
Building Permit valuation formulaFrom $48Formula
Service and Facility Rental Fees, Fiscal Year 2026-27 — Extracted SectionLocation: FY2026-27 Service and Facility Rental Fees, Development Services — Construction PermitsConfirms: The current City fee schedule supplies the complete valuation-tier Building Permit formula, while the live page confirms a dedicated ADU/JADU estimate route.

Plan check

Review of your drawings for code compliance.

FeeAmountBasisSource
Residential Building plan-check fee75% formulaFormula
Service and Facility Rental Fees, Fiscal Year 2026-27 — Extracted SectionLocation: FY2026-27 Service and Facility Rental Fees, Plan Check — Residential Building Plan Check

Impact fees

Development impact fees. Prohibited for ADUs of 750 sq ft or less.

FeeAmountBasisSource
ADU impact and connection-fee lookupVerify on the City’s official websiteVerify on the City’s official website
Building FeesLocation: 2026 Connection & Development Impact Fees — Residential, Notes 5–8; Building Fees estimator instructions

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Vacaville before you commit money.

Back to Vacaville · Permit process · Build a permit report · How we build these estimates