ADU permit cost and fee breakdown in Victorville, California

An early-budgeting estimate of the permit-related fees an accessory dwelling unit is likely to incur in Victorville. These are not official figures.

Prepared by GetYourPermit editorial teamReport an error

16 fee lines

ADU size

California generally exempts ADUs under 750 sq ft from development impact fees, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

Estimated total permit fees at 750 sq ft

$6,800 – $22,200

Assumed construction valuation

$270,000

Used only to compute valuation-based fees. It is not a construction quote.

Where the money goes

  • Building permit$1,200 – $4,500

    The core permit issued by the city building department.

  • Plan check$900 – $3,500

    Review of your drawings for code compliance.

  • Impact fees$0 – $1,300

    Development impact fees. Often waived for ADUs under 750 sq ft.

  • School district fees$0 – $5,000

    Developer fees charged by the local school district.

  • Utility connection$4,275 – $6,150

    Water, sewer, and electrical connection or capacity charges.

  • Inspection$400 – $1,500

    Field inspections during construction.

  • Technology & surcharges$25 – $200

    Records, technology, and general plan surcharges.

  • Other$0 – $50

    Fees that do not fit the categories above.

The darker segment is the low end of the range; the full bar is the high end.

Read before you budget

  • Most fee lines are working estimates rather than verified published city rates. Confirm every line with the city before budgeting.
  • Some fee items appear more than once, so category totals may double count.

Fee items

Building permit

The core permit issued by the city building department.

  • ADU building permit fee estimate

    $1,200 – $4,500

    Estimated range

Plan check

Review of your drawings for code compliance.

  • ADU plan check fee estimate

    $900 – $3,500

    Estimated range

Impact fees

Development impact fees. Often waived for ADUs under 750 sq ft.

School district fees

Developer fees charged by the local school district.

  • ADU school impact fee estimate

    $0 – $5,000

    Estimated range

Utility connection

Water, sewer, and electrical connection or capacity charges.

Inspection

Field inspections during construction.

  • ADU inspection fee estimate

    $400 – $1,500

    Estimated range

Technology & surcharges

Records, technology, and general plan surcharges.

  • ADU technology surcharge estimate

    $25 – $200

    Estimated range

Other

Fees that do not fit the categories above.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Victorville before you commit money.

Back to Victorville · How we build these estimates