ADU permit cost and fee breakdown in Anaheim, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in Anaheim, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

3 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$7,000 – $12,500

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$9,650

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$400 – $800

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$1,488 – $2,604

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$912 – $1,596

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • Separate trade permits$700 – $1,200

    Shown separately only where electrical, plumbing, or mechanical permits are billed outside a combination permit.

  • School district fees$2,400 – $3,300

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$800 – $2,400

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Processing, inspection & records$200 – $400

    Fixed processing, inspection, records, and administrative charges.

  • Surcharges, taxes & state fees$100 – $200

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Building permit issuance

The permit issuance charge; where plan check is bundled, the combined amount is carried here.

FeeAmountBasisSource
Combined plan check and building permit feeVerify on the City’s official websiteFormula
Combined Plan Check and Building Permit FeesLocation: PDF page 5, Tier 3 Residential Buildings Category 1 lookup table and Notes 1–5Confirms: The currently linked official schedule is a tiered square-foot formula, not a single flat ADU fee; the live page does not state a formal effective date.

Plan check

Review of your drawings for code compliance.

FeeAmountBasisSource
Plan check share of combined fee62% formulaFormula
Combined Plan Check and Building Permit FeesLocation: PDF page 5, Note 1 and Note 2Confirms: The City document allocates 62% of the combined amount to plan review.

Inspection

Field inspections during construction.

FeeAmountBasisSource
Building permit inspection share of combined fee38% formulaFormula
Combined Plan Check and Building Permit FeesLocation: PDF page 5, Note 1 and Note 3Confirms: The City document allocates 38% of the combined amount to building-permit inspections.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Anaheim before you commit money.

Back to Anaheim · Permit process · Build a permit report · How we build these estimates