ADU permit cost and fee breakdown in Oakland, California

GetYourPermit’s researched permit-fee range for a detached accessory dwelling unit in Oakland, with category estimates and direct reference links used in our investigation.

Prepared by GetYourPermit editorial teamReport an error

4 fee lines

ADU size

California prohibits development impact fees for ADUs of 750 sq ft or less, so the 749 / 750 / 751 steps are worth comparing.

Estimated total

GetYourPermit researched range at 750 sq ft

$7,600 – $13,915

This estimate combines our fee-schedule research and project-planning experience. Actual charges vary by parcel, plans, valuation, utilities, and outside agencies.

Typical planning amount

$10,609

Modeled at the 600 sq ft reference.

Where the money goes

These are fee components within the permit process, not separate approvals.

  • Separate planning / zoning fee$500 – $1,000

    Shown only where the City bills Planning or zoning review as a separate fee.

  • Building plan check$2,194 – $3,275

    The Building Division’s review of the drawings; part of the Building Permit process.

  • Building permit issuance$450 – $850

    The permit issuance charge; where plan check is bundled, the combined amount is carried here.

  • Separate trade permits$550 – $1,150

    Shown separately only where electrical, plumbing, or mechanical permits are billed outside a combination permit.

  • School district fees$1,800 – $3,000

    Possible school-district developer fees based on current thresholds and scope.

  • Utility fees$300 – $900

    Possible water, sewer, electrical, meter, or capacity-related charges.

  • Processing, inspection & records$1,656 – $2,472

    Fixed processing, inspection, records, and administrative charges.

  • Surcharges, taxes & state fees$150 – $1,268

    Percentage surcharges, construction taxes, and State-mandated charges.

The darker segment is the low end of the range; the full bar is the high end.

Published fee references

Plan check

Review of your drawings for code compliance.

FeeAmountBasisSource
R3 new-construction plan reviewFrom $336Formula
Fiscal Year 2025-26 Adopted Master Fee ScheduleLocation: Master Fee Schedule, Planning & Building section O-3, Building Construction Permits row D.1Confirms: The FY 2025-26 adopted schedule records the valuation rate and minimum for R3 new-construction plan review; it is historical evidence pending current City confirmation.
R3 repair, addition, or alteration plan reviewFrom $336Formula
Fiscal Year 2025-26 Adopted Master Fee ScheduleLocation: Master Fee Schedule, Planning & Building section O-3, Building Construction Permits row D.3Confirms: The FY 2025-26 adopted schedule records the valuation rate and minimum for R3 repair, addition, or alteration plan review; it is historical evidence pending current City confirmation.

Inspection

Field inspections during construction.

FeeAmountBasisSource
R3 new-construction inspectionFrom $336Formula
Fiscal Year 2025-26 Adopted Master Fee ScheduleLocation: Master Fee Schedule, Planning & Building section O-3, Building Construction Permits row D.2Confirms: The FY 2025-26 adopted schedule records the valuation rate and minimum for R3 new-construction inspection; it is historical evidence pending current City confirmation.
R3 repair, addition, or alteration inspectionFrom $336Formula
Fiscal Year 2025-26 Adopted Master Fee ScheduleLocation: Master Fee Schedule, Planning & Building section O-3, Building Construction Permits row D.4Confirms: The FY 2025-26 adopted schedule records the valuation rate and minimum for R3 repair, addition, or alteration inspection; it is historical evidence pending current City confirmation.

These are estimates, not official fees

Use these figures for early budgeting only. They are not a quote, not a government fee determination, and not legal advice. Actual fees depend on your parcel, your plans, your construction valuation, your utility provider, and the fee schedule in force on the day your permit is issued. Confirm every number with Oakland before you commit money.

Back to Oakland · Permit process · Build a permit report · How we build these estimates